The 1000t LG finished the last beam for Chang-Jing-Huang High-speed Railway
Publication Date:2022-09-26On 26th September, 2022, the Launching Gantry specially designed and manufactured for the 1000t/40m pre-cast concrete box beam of Chang-Jing-Huang High-speed Railway finished the last piece of box beam in the jobsite.
Tolian supplied one set of 1000t Launching Gantry, one set of 1000t Special Transporter and one set of 1000t rail mounted Straddle Carrier for this project. And Tolian Assembly team also undertook the task of beam erection for all the 233 beams.