Tolian won the order of deck erection crane
Publication Date:2017-01-07On 6th January, 2017, Tolian win another order from CCCC Second Highway Engineering Co., Ltd.
Tolian will provide two sets of deck erection gantry to Humen No.2 Bridge.
Humen No.2 Bridge is the important part of Guangdong Highway system. Total length 12.89km, 8 lanes, design speed 100km/h. The 1688m main span of this steel girder cable stayed bridge will be the second to the akashi keiko bridge in Japan.